Speednet update dated 20.5.11

Friday, May 20, 2011

Speednet Update dtd 20.5.11 had been released

Speed Net Team, Centre For Excellence In Postal Technology, PTC, Mysore is releasing Speed Net Ver 3.1.2 Updated Version on 20/05/2011.

This Release is specifically for providing EPP Booking for BNPL Articles with Circle allotted Barcode prefix validation, EPP Distance Configuration for Cities, closing separate EPP Bag with EPP Articles.

Delivery of EPP Articles was already available in the SpeedNet earlier version and the same is continued.

Note: 1: If SpeedNet 3.1.2 is not upgraded with 21/03/2011 or later updates then DB Upgradation should be first done through Database Workshop Module using the DB Updation SQl Scripts and then do the updation through Exl file.)


Note:2 :Those MBCs and BNPL Uinits who are permitted from directorate to close Direct Bags should run the Direct Bag Script received by them from PTC Mysore, after the DB Upgradation as mentioned above to get the Direct Bagging provision.


Please note that – this version can also be used by all other offices using SpeedNet 3.1.2 - which have not used earlier SpeedNet 3.1.2 updates kept in FTP and also for Fresh Installations. EPP provisions of this version is only an Add On provision to the already existing features in SpeedNet.


Download

0 comments:

Post a Comment

Pages

Powered by Blogger.

  © Blogger template On The Road by Ourblogtemplates.com 2009

Back to TOP  

TRAFFIC WEB Spin Palace Casino slots tips William hill poker metatrader